| Third phase of Monster Makeover construction: Pit wall and pit road (January 8, 2009) |

01.08.09 - Crews remove beams from the site of the old boiler plate pit wall. |

Crews use a crane to pull the existing wall out of the ground to make way for the new concrete barrier. |

A construction worker continues to work on the existing pit wall. |

The remnants of the old pit wall sit piled up on pit road. |

The grass in front of the pit road wall has been eliminated. |

A shot of pit road from the start-finsh line. |

One-by-one the posts were removed. |

A worker removes piece of the beam. |

A view of pit road near Victory Lane. |

After the crew removed the boiler plate they turned their attention towards pulling the support posts from the ground. |

A crane was used to lift portions of the wall from the ground. |

Pieces of the old pit wall lay in a crumbled heap on pit road. |

A single beam from the old pit wall remains standing. |

A worker clears scraps from the pit wall. |

01.28.09 - Rebar has been secured in the area of where the new concrete pit wall will be built. |
| |